Inquiry
Lithium-ion batteries are increasingly used in uninterruptible power supply (UPS) systems for data centers, telecommunications infrastructure, and industrial facilities. For UPS manufacturers, battery suppliers, and system integrators, selecting a suitable battery involves more than comparing capacity and voltage. The battery must also meet the safety and compliance requirements applicable to the intended product and market.
UL 1973 is an important safety standard for battery systems used in applicable stationary applications, including UPS installations. However, battery certification alone does not establish that the complete UPS is compliant or that the battery is compatible with every UPS model.
This guide explains what UL 1973 covers, how it differs from other relevant standards, and what OEMs should verify before approving a lithium UPS battery for integration or procurement.
UL 1973, Batteries for Use in Stationary and Motive Auxiliary Power Applications, establishes safety requirements for battery systems within its scope, including applicable UPS battery applications.
For lithium-ion batteries, the standard evaluates safety under specified conditions, including applicable simulated abuse tests. It does not establish a universal guarantee of battery capacity, backup runtime, cycle life, or compatibility with every UPS.
For OEMs, three separate questions need to be answered:
As of October 2026, UL Standards & Engagement lists UL 1973 Edition 3 as active. Before beginning a new qualification project, verify the applicable edition, revisions, and certification requirements with the relevant certification body.
These standards address different aspects of battery and UPS safety. The appropriate compliance pathway depends on the product configuration, target market, customer specifications, and applicable regulations.
| Standard | Primary scope | What OEMs should verify |
|---|---|---|
| UL 1973 | Battery systems within its stationary and auxiliary power scope | Whether the battery configuration has the required safety evaluation |
| UL 1778 | Uninterruptible power systems | Whether the complete UPS meets applicable equipment safety requirements |
| IEC 62619 | Industrial lithium cells and batteries | Whether the battery meets applicable industrial lithium battery safety requirements |
| UN 38.3 | Transport testing for lithium batteries | Whether applicable transport-testing requirements are met |
For UPS products intended for North American customers, evaluate UL 1973 early when the battery falls within its scope and the applicable certification pathway or customer specification calls for it.
UL 1778 addresses the safety of UPS equipment. A battery's UL 1973 certification does not automatically establish compliance of the integrated UPS.
IEC 62619:2022 specifies safety requirements and tests for secondary lithium cells and batteries used in industrial applications, including UPS systems. It may be relevant to projects serving international markets, depending on customer specifications and the applicable compliance framework.
UL 1973 and IEC 62619 should not be assumed to be interchangeable. Confirm which standard is accepted for the specific product, market, and project.
No. UL 9540 addresses energy storage systems and equipment within its scope. Whether it applies depends on the product classification, intended use, and relevant requirements. It should not be treated as a universal requirement for every UPS battery.
A certification claim is only useful when the supporting evidence matches the product being purchased. Before approving a supplier, verify the following information.
Request the applicable certification record, model schedule, and relevant supporting documentation. Confirm the manufacturer, model designation, electrical ratings, and configuration covered by the evaluation.
Pay particular attention to the distinction between a cell, module, battery pack, and complete battery system. Documentation covering one component does not necessarily demonstrate that the entire proposed assembly has been evaluated to the same standard.
A supplier declaration, laboratory test report, and product certification record are different forms of evidence. Verify the certification through the appropriate official directory or certification organization, and ask for clarification if the product scope is unclear.
| Document | What to check |
|---|---|
| Certification record | Issuing organization, status, covered manufacturer, model, and scope |
| Battery datasheet | Voltage range, capacity, charge and discharge limits, and operating conditions |
| Installation instructions | Permitted configuration, environmental limits, and installation requirements |
| Relevant test documentation | Evaluation scope and applicable limitations |
| Change-control records | How component and design changes are reviewed for certification impact |
The exact documentation required depends on the project and certification pathway. If a document is unavailable, ask the supplier or certification body what alternative evidence is acceptable.
For a broader assessment of engineering, validation, and production capability, see our guide to evaluating a custom lithium UPS battery manufacturer.
A battery can have the relevant safety certification and still be unsuitable for a particular UPS. OEMs should validate the battery against the actual UPS specifications rather than relying on nominal voltage or capacity alone.
For example, a battery may have the correct nominal voltage but an incompatible maximum charging voltage. Such a mismatch must be resolved before the combination is approved.
Where the project requires a tailored electrical or communication configuration, review our guide to a custom lithium UPS battery system.
For a product-specific reference, see the 48V lithium-ion UPS battery and review its documented voltage, charging, discharge, temperature, and certification information. Its specifications should not be assumed to apply to other battery models.
UL 1973 does not guarantee a specific backup duration. Runtime must be evaluated against the intended load, UPS conversion efficiency, battery discharge characteristics, end-of-discharge limits, and required design margin.
Also confirm the permitted operating temperature, cooling requirements, enclosure conditions, and installation instructions against the actual environment.
Use documented acceptance criteria and representative operating conditions to validate performance. For detailed capacity calculations, see our guide to UPS battery sizing calculations.
Changes to a previously qualified battery may affect its certification scope or compatibility with the UPS. Examples include:
Not every change automatically requires complete recertification. The impact depends on the existing certification, the nature of the change, and the applicable requirements.
Before approving a change, the OEM should:
The key principle is to assess certification against the actual approved configuration, not simply the product family name.
Before approving a UPS battery supplier or releasing a battery for production, confirm that the following decisions have been resolved.
Assign unresolved questions to the appropriate team:
Not universally. Requirements depend on the target market, applicable codes, product certification pathway, and customer specifications. Confirm the requirements for the specific project before selecting the battery.
Not automatically. The standards have distinct scopes and certification pathways. Acceptance of one in place of the other must be confirmed for the intended market and application.
Verify the certification record first and determine what it covers. Ask the supplier or certification body whether additional documentation is necessary for the intended application. A full test report may not be required for every procurement decision, but the available evidence must be sufficient to establish compliance with the applicable requirements.
No. The battery's operating limits, charging requirements, discharge capability, communication interface, installation conditions, and the UPS's applicable requirements must be checked for the specific combination.
UL 1973 is an important safety standard for battery systems used in applicable UPS applications, but certification is only one part of battery qualification.
OEMs should establish the applicable compliance pathway, verify the exact certified configuration, and validate electrical compatibility, BMS coordination, runtime, and integration with the complete UPS. When a supplier proposes a design change or replacement battery, its impact on existing certification and product approval should be confirmed before implementation.
This approach turns certification from a procurement checkbox into a documented qualification process, helping manufacturers make better-supported decisions about battery safety, compatibility, and product compliance.